PT Nissan Motor Indonesia is a manufacture and distributor company of “Nissan” car. Nissan as a worldwide company with Japan investment, invite young, dynamic, and smart people to join our team, and grow with us.Production Engineer Staff - Purwakarta
Responsibilities:
* Capacity Increase and new model launch preparation
* To be able to set up new procedure and its preparation for new process.
* Grasping paint quality on vehicle.
* Analysis of abnormal factor.
* Technical support to abnormal condition.
* Capacity of each process.
* KAIZEN Activities (Quality improvement, reduction of direct materials, Man hours).
* Analysis of chronic quality problem and its countermeasure.
* Finding cost reduction item and suggestion for implementation of KAIZEN.
* Paint shop process line equipment and facility confirmation
* Analysis problem of Down time equipments and its countermeasure corporate with Maintenance section.
Requirements:
* Bachelor degree from reputable university, major in Industrial, Electrical or Mechanical Engineering, with GPA min 3.00 out of 4.00
* Has more than 2 years experiences in the same field.
* Single/Married, age maximum 32 years old.
* Fluent in English is a must, both oral and written.
* Have good analytical thinking, numerical ability, logic of verbal, and good perspective.
* Have good communication skill, interpersonal relationship, and able to work in team.
* Computer literate, fast learned, can work under pressure, available work overtime, hard working and interest in automotive.
Please submit your complete application letter before September 10th, 2011 to:
PT Nissan Motor Indonesia
hrd@nissan.co.id
(Subject: Production Engineer)
Only short listed candidates who meet requirement will be notified.


PT. Hino Motors Manufacturing Indonesia is the strategic production base in ASEAN region, which will be able to respond to every need and demand that rises from the local and ASEAN region. It is located in Kota Bukit Indah Cikampek, Jawa Barat, spread across 120,000 m2 of land, with 10,000 units production capacity in one year